NEWS

Advantages and Connection Methods of Stainless Steel Compression Fitting


Stainless steel double compression fittings are one type of compression fittings, and the other type is single compression fittings. Double compression fittings have to some extent replaced traditional screws and welded connections. These are new pipe fittings in the field of water supply and heating.
Advantages of stainless steel compression fittings:
1. The connection method is simple and scientific. Double compression has strong compression resistance, and the system has high compression resistance, which is 80% stronger than ordinary compression connection technology
2. The clamping type pipe fittings have a large inner diameter, smooth pipe walls, and moderate curvature of the connecting parts, which can reduce flowing noise, straighten turbulence, and increase flow.
3. Stainless steel compression fittings have strong vibration resistance. Due to water hammer
4. It is not easy to cause looseness and leakage. The connection part is an integral type without disassembly. Single push molding, fast and reliable installation.
5. Stainless steel compression fittings are widely compatible. The wall thickness of the connecting pipeline varies from 0.6mm to 2.0mm. After being connected, the instantaneous withstand voltage of the system reaches 2.4MPa and operates. The pressure can reach 1.6MPa, which meets the GB/T19228 standard. Or meet the market requirements of the GB/T12771-2008 pipeline standard.
The connection method for stainless steel compression fittings is as follows.
If you want to connect two pipes or connect the pipes to a fitting, use a clamp type fitting and insert the pipe directly into the fitting. The key is the pipe, and the O-ring inside the pipe should not be tilted to avoid puncturing. Affects the sealing effect.
2. Special clamping tools are used for clamping. The new tool is easy to use and does not require manual clamping. Simply press a button to achieve automatic pressing operation. The previous pressing tool takes 2-3 seconds;
3. After all jamming, pressure testing should be carried out to ensure that the pipeline is sealed without leakage.